Pick a transformer bushing by the media on its two sides, then narrow it by Um, insulation level and current. For transformer, GIS and project engineers and buyers: the family table plus the interface checks to settle on the drawing.

Three high-voltage transformer bushings mounted on a tank lid in a substation

A bushing is selected by its two media, its rating row and its mechanical interface on the confirmed drawing.

To select a transformer bushing, start with what is on each side of it. The two media the bushing joins name the family. The highest voltage for equipment (Um), the insulation levels and the rated current then narrow that family to one rating row.

We make dry capacitor bushings for transformers, reactors, gas-insulated switchgear (GIS) and walls, and this guide takes the steps in that order:

  • Media pair → family. Read both sides off the single-line or general arrangement (GA) drawing.
  • Um and one insulation row → voltage rating. Take the impulse and power-frequency values from the same row.
  • Current and overload → current step and conductor arrangement. Check whether the offered draw-lead design can carry the required current and fit the winding lead through its centre tube.
  • Interface, site and drawing → order. Fit, service conditions and the approved drawing settle the rest.

Start with what is on each side of the bushing

A bushing carries a conductor through a wall, tank or other partition and insulates it from that partition.5 So the first question is simple: what is on each side of that partition? The insulating medium at each end shapes that end of the bushing, which is why the media pair decides the family.

Three bushing cross-sections showing the oil–air, GIS–air and oil–SF6 boundaries
The gas–air bushing opens to air, while the direct joint links transformer oil to the GIS gas compartment.
Family Side A Side B Chosen by Handbook voltage range
Oil–air transformer bushing Transformer oil Air Media pair 12–550 kV
GIS bushing GIS SF6 gas (handbook example) Air Media pair 40.5–550 kV
Oil–SF6 bushing Transformer oil GIS SF6 gas (handbook example) Media pair 40.5–550 kV
Oil–oil bushing Oil Oil Media pair 40.5–550 kV
Wall bushing Air Air Wall duty 12–550 kV
High-current bushing Transformer oil Air Current duty 24–40.5 kV

Read the table row by row:

  • Oil–air takes a transformer or reactor winding out of the tank to an overhead line or busbar. Our handbook drawings mark an air end and an oil end.
  • GIS takes a GIS conductor out of the gas enclosure to air. The drawings are labelled air side and GIS side.
  • Oil–SF6 connects a transformer straight into GIS filled with SF6, with no air in between. Its drawing names an SF6 end and an oil end.
  • Oil–oil joins two oil-filled spaces. Its selection table gives oil-end and transformer-end fields.
  • Wall and high-current bushings are picked by the job, not the media. More on both below.

The voltage column gives family ranges, not a promise of every rating. The current section covers the current steps and limits for transformer, GIS and high-current bushings, and the drawing section explains why the drawing, not the range, decides.

GIS and oil–SF6 are different boundaries

The handbook shows two SF6 configurations at different boundaries. Its GIS bushing goes from SF6 gas to air, while its oil–SF6 bushing goes from transformer oil to SF6 gas.

If the transformer feeds an overhead line, you need an oil–air bushing. If the transformer connects directly to GIS filled with SF6, use an oil–SF6 bushing. If the GIS itself connects to a line through air, use a gas–air GIS bushing. For another gas or mixture, keep the same boundary check and confirm that the offered design matches the gas and filling pressure. Picking by the word "GIS" alone can send an oil–SF6 job into a GIS-bushing enquiry; the side labels on the drawing settle it. For a closer comparison, see GIS bushing vs oil–SF6 bushing.

Wall and high-current bushings are chosen by duty

A wall bushing carries the conductor through a building wall or partition, usually with air on both sides. Our handbook covers it across the range shown in the table. See wall bushings.

Check the high-current bushing drawings for a low-voltage, high-current lead such as a generator transformer. The oil and air are the two media. The busbar connects at the air end. The handbook's range table runs to 40,000 A, but the drawn rows of EBRG, our porcelain high-current series, stop at 31,500 A. Above that, the handbook has no drawn row to select from. See high-current bushings.

Check which standard your specification cites

The standard in your specification has to cover the boundary you picked. IEEE C57.19.00-2023 covers liquid-immersed transformer and reactor bushings with a BIL, the lightning impulse level the insulation must withstand, above 110 kV.4 Its scope excludes bushings with an external gas other than air.4 So a specification that cites only IEEE C57.19.00 does not cover a GIS-side or oil–SF6 connection.

IEC 60137 applies to a bushing supplied on its own for use on three-phase AC equipment operating above 1,000 V at 15–60 Hz, including bushings for reactor applications.2 Where it applies, check which standard each offer was tested to. Use the project drawings for the direct GIS joint, as the comparison linked above explains.

Rate the voltage from Um and the insulation levels, not the system name

Choose the voltage class by Um and read every insulation value from the same rating row. Um is the highest voltage for equipment: the top system voltage the bushing is designed to run at. Rating tables are keyed by Um, not by the nominal name of the network.

Each Um row is a set. It pairs a lightning impulse withstand (LI, called BIL in IEEE terms), a one-minute power-frequency withstand and, at the higher classes, a switching impulse withstand (SI). Our handbook's transformer and reactor table shows how the set changes:

Um (kV) Power-frequency withstand (kV) Lightning impulse (kV) Switching impulse (kV)
123/126 255 550 —
245/252 505 1,050 850
362/363 520/625 1,175 950
  • At 123/126 kV the handbook gives both power-frequency and lightning impulse withstand values. The switching impulse cell is blank.
  • From 245/252 kV the switching impulse joins the set, so it belongs in your specification too.
  • At 362/363 kV the handbook prints two power-frequency values. Check the required withstand in the project's insulation-coordination schedule or specification against the offered rating row.

Families differ at the same Um. In the handbook's GIS table, the 245/252 kV row lists 460 kV power-frequency instead of 505 kV, and its partial discharge is measured at 1.2Um/√3. Mixing a value from the GIS table with one from the transformer table describes a bushing nobody draws.

Then check the bushing against the winding. Ellis gives the rule of thumb that the bushing's BIL must equal or exceed the BIL of the winding it connects to, even when two bushing classes share the same line-to-ground rating.1 Pick the row whose lightning impulse is at or above the winding BIL, and take its other values with it. The next row up costs size and money; a row below the winding BIL is not an option.

Partial discharge and tan δ (dielectric loss) limits are a different matter. They are acceptance values tied to a test voltage and a test stage, not inputs for choosing the family. Type tests vs routine tests explains how to read them.

Size the rated current for the real duty

Work out the winding line current at the specified load and overload duty, then choose a continuous rating at or above the required current. For three-phase equipment, divide the three-phase apparent power in volt-amperes (VA) by the product of the square root of three and the line-to-line voltage in volts (V). The result is in amperes. The overload duty matters as much as the nameplate current: a bushing sized for nominal current only becomes the weak point when the transformer runs its emergency rating. Verify the short-circuit duty separately. Use the system's short-circuit level to specify the required short-time withstand current and its duration. Give them with the enquiry and check them on the confirmed drawing or data sheet; the bushing RFQ specification guide lists the rest.

Draw-lead or current-carrying

Current also decides how the conductor runs through the bushing. In a draw-lead (cable-through) bushing, the winding lead is pulled up through the bushing's central tube and connected at the top. Graham, in Ryan's High-Voltage Engineering and Testing, gives about 1,250 A as a historical example of a limit set by the flexible cable.7

If the offered draw-lead design cannot meet the required current or accommodate the lead, consider a current-carrying (bottom-connected) bushing. Its own conductor carries the current, and the winding lead is bolted to its lower terminal inside the turret, the raised tank opening the bushing mounts on. Our handbook lists both arrangements for oil–air bushings, each with a composite or porcelain housing.

Steps matter more than family ranges. The handbook's GIS family table runs from 630 to 8,000 A, but the GIS selection drawings use 2,000/3,150/4,000/5,000 A steps. Design around a drawn step, not the family maximum.

When it becomes a high-current bushing

The handbook's oil–air transformer and reactor family goes up to 8,000 A. For higher current on an oil–air connection, check for a high-current drawing that matches both the required voltage and current. Its drawn porcelain EBRG rows list 24 kV and 40.5 kV models from 10,000 to 31,500 A, with separate terminal dimensions for the air end and the oil end. Match both terminals to your busbar and winding connections. If none of the drawings matches the combination, get a confirmed project rating from the supplier. See high-current bushings.

Check the mechanical interface against the tank or GIS

A correctly rated bushing still has to fit. IEC's definition counts the flange or fixing device as part of the bushing,6 so the interface is part of the selection, not an afterthought. Check these four items against the tank, turret or GIS drawing.

Transformer bushing cutaway showing the mounting flange, current transformer position and installation angle
Check the flange, the reserved CT position and the installation angle against the offered drawing.

Conductor arrangement and head sealing

Check how the winding connects on the offered drawing. A draw-lead uses the flexible winding lead, a draw-rod uses a removable conducting rod, and a bottom-connected design takes the winding connection at the lower terminal. For draw-lead heads, our transformer bushing guide requires no gap between the top cap and the connection seat as part of the water seal. The guide also calls for flexible connections at both ends of the bushing, which keeps line and lead forces off the bushing.

End lengths and flange fit

Compare the oil-side length, including its stress shield, with the clearance inside the tank. Compare the air-side length with your installation layout. Our drawings mark both ends. Where there is a gas-side end, check its insertion depth and clearance against the GIS compartment drawing.

Length tolerances matter at assembly. With the bolted stress-shield type, the total oil-end length is measured after assembly and checked against the outline drawing. Match the flange, its bolt circle and the gasket face to the turret (the raised tank opening the bushing mounts on) or to the GIS enclosure opening.

Space for bushing current transformers

Where current transformers (CTs) sit around the bushing in the turret, they need a grounded section below the flange. In our model code, the letter L marks a bushing with a reserved CT installation position. Check that this section on the drawing is long enough for your stacked CT cores, and that the lower end still sits where the tank design expects it.

Mounting angle, terminal access and terminal load

Our transformer bushing guide covers an installation angle of 0° to 60°; above 60° the bushing needs a special design. The oil–air transformer bushing models show how the turret-mounted family is drawn. Check also that the terminals can be reached and connected in the mounted position without clashing with nearby parts. Then state the load the connected line or busbar puts on the air-end terminal. That load has to sit within the offered design's rated terminal load, which the confirmed drawing or data sheet should state.

All handbook dimensions are references; the issued drawing governs. If the tank and the bushing are being designed in parallel, keep an open-items list until the turret is frozen: each unresolved dimension, who supplies it and who approves it. Fixing the bushing drawing first delays the tank design a little; designing the turret first risks a bushing that will not fit.

Check the site and service conditions before assuming a standard design

Compare the site with the manufacturer's stated service conditions before you assume a standard design. Our two installation guides set them out separately for transformer and GIS bushings.

For transformer bushings (guide Q/ZL-JS-501), the general conditions are an ambient of −50 °C to +55 °C and a reference altitude of 1,000 m. The tank oil may run at up to 90 °C as a daily average, with a temporary maximum of +115 °C during short-time overload. A steep installation angle also needs a special design, as the interface section explains.

For GIS bushings (guide Q/ZL-JS-502), the altitude basis is also 1,000 m, with correction to the standard and project requirements above it. The enclosure-side SF6 is rated at 0.45–0.6 MPa, with a maximum of 0.8 MPa. The guide covers vertical or inclined mounting and pollution class IV; an inverted GIS bushing needs a special design.

Record whether the air end will be indoors or exposed outdoors and check the service conditions approved for the offered model. For an exposed outdoor end, pollution sets the air-side creepage, the surface path along the sheds. Outdoor insulation is selected from a site pollution assessment, a reference creepage and then corrections for the insulator, the site and the system.3 State the site pollution class, or the creepage your utility requires, in the first enquiry. Creepage distance and altitude covers the calculation and the altitude correction.

Outside these conditions, the bushing becomes a special design or gets a correction, and the project gets its own drawing.

Settle the details on the approved drawing, not the catalogue

Order against the approved drawing number and revision, not a family name or a catalogue range. As with the interface checks, handbook dimensions are only references. A family range does not mean every voltage and current combination inside it exists as a drawn model. Where a project has its own technical agreement, that agreement and the confirmed drawing govern.

What to fix on the drawing

  • The full model string, copied from the drawing, not the family letters. Prefixes change: our factory corrected the oil–SF6 prefix from YQBRGL to YQRGL.
  • Drawing number and revision, on the purchase order and the technical agreement.
  • Oil-side and air-side lengths, the flange and the gasket face.
  • The CT section and the terminals.
  • Any special-design condition from the site check: altitude, angle, pollution.
  • For GIS and oil–SF6 bushings, the gas side: record the insertion depth and clearance against the GIS compartment drawing, along with the insulating gas and filling pressure specified by the GIS supplier. If the GIS uses another gas or mixture, confirm that the offered design matches that gas and pressure. GIS bushing vs oil–SF6 bushing covers the gas-side details.

Replacing a bushing on an existing transformer

Matching voltage and current is not enough on a replacement. Start from the old nameplate model and the existing turret, flange and CT details, and get a drawing that matches them. Older documents can carry a different prefix for the same family, so quote the exact model from the drawing. Collecting the old interface data takes time, but it is the way to avoid modifying the turret.

The same discipline helps when you review a supplier's document set: rating, model string and drawing revision should match across the offer, the drawing and the test records. For the full list of what to send with an enquiry, see the bushing RFQ specification guide. Receiving and storing the bushings is covered in bushing storage and transport.

Questions engineers also ask about bushing selection

Which standard should the specification cite?

Check IEC 60137 when you buy the bushing separately for three-phase AC equipment within the voltage and frequency range given in the family section. The IEEE C57.19 series is the North American reference for liquid-immersed transformer bushings; its general standard excludes external gas other than air, as the standards check in the family section explains.

Where do RIP and RIF come in?

After the family and the rating. RIP (resin-impregnated paper) and RIF (resin-impregnated fibre) describe the insulation inside the bushing, not the media outside it. The RIP vs RIF comparison covers that choice.

Which test records should come with the bushing?

Routine tests apply to each unit. Type tests qualify a design. Check that each report belongs to the model and drawing you are buying. Type tests vs routine tests explains what each one proves.

Choose the family first, then let the drawing settle the rest

Bushing selection follows one order:

  • Media pair → family. Oil–air, GIS, oil–SF6 or oil–oil, or wall and high-current by duty.
  • Um, one insulation row and the current → rating. Take the values as a set and check the BIL against the winding.
  • Interface and site → fit. Conductor, lengths, flange, CT section, angle and service conditions.
  • Approved drawing → order. The model string, drawing number and revision go on the purchase order.

When those inputs are ready, the bushing RFQ specification guide lists what to send, and the bushing families overview shows where each family sits. More guides are in bushing knowledge and selection resources.

Next step

Review the Relevant Bushing Options

See our dry-type bushing families for transformers, GIS and wall duty.

References

  1. Keith Ellis, Bushings for Power Transformers: A Handbook for Power Engineers (AuthorHouse, 2011) — 2011
  2. IEC 60137:2017 — Insulated bushings for alternating voltages above 1 000 V (IEC webstore public page) — 2017-06-22
  3. IEC TS 60815-1:2025 — selection and dimensioning of high-voltage insulators for polluted conditions (IEC public description) — 2025-11-24
  4. IEEE C57.19.00-2023 — General Requirements and Test Procedure for Power Apparatus Bushings (IEEE public abstract) — 2023-05-15
  5. IEC 60050 IEV 471-02-01 "bushing" (Electropedia) — 2007-05
  6. IEC 60050 IEV 471-02-01 "bushing" — fixing device and conductor (Electropedia) — 2007-05
  7. J. S. Graham, Chapter 12 in H. M. Ryan (ed.), High-Voltage Engineering and Testing, 3rd ed. (IET, 2013) — 2013

How this guide was prepared: Prepared by ZLVOLT engineering from our dry-type bushing handbook, our transformer and GIS bushing installation and maintenance guides (Q/ZL-JS-501-2026 and Q/ZL-JS-502-2026) and the standards and books listed above. The confirmed drawing and the project technical agreement decide the final design. Content date: November 2026.