Routine PD & Tanδ Testing
Quality & Testing
Bushing Quality, Certificates & Test Evidence
Every high-voltage bushing is manufactured under ISO 9001 quality management and subjected to 100% routine partial discharge and dielectric testing before dispatch.
Lightning Impulse Capacity
Guaranteed Routine PD Level
CTQC Type Test Reports
Testing Infrastructure
In-House High Voltage Test Hall & Systems
Our Beijing facility operates 6 complete high-voltage test and measurement systems, capable of full routine and dielectric qualification testing up to 550 kV.
Lightning Impulse Test System
Full-wave & chopped-wave lightning impulse tests for bushings up to 550kV class (per IEC 60137 & IEEE C57.19.00).
Impulse Voltage Measurement System
Precision peak voltage and waveform recording for steep-front and standard impulse evaluation.
Variable Frequency Resonant Test System
High-voltage power-frequency withstand testing with low-noise partial discharge background.
Power Frequency Withstand System
Routine dry and wet power-frequency withstand tests up to 600kV.
Standard Capacitor Reference Divider
High-precision reference capacitance for loss factor (tanδ) and dielectric constant calibration.
Automatic Precision Tanδ Test Bridge
Multi-step tanδ (dielectric loss angle) and capacitance measurements across temperature ranges.
Beyond factory routine testing, ask our engineers which test-tap sensor and online monitoring options suit your project.
Factory Acceptance
100% Routine Test Protocol for Every Unit
Unlike general industrial components, every single capacitor bushing undergoes a complete routine test cycle in accordance with IEC 60137 and GB/T 4109 before factory release.
A formal Routine Test Certificate with specific measured capacitance (C1), dielectric dissipation factor (tanδ), and partial discharge values is included with every delivery.
View Available Test Documents →100% inspection of core vacuum resin impregnation, curing temperature curves, and critical mounting dimensions.
Pressure tightness and vacuum retention checks on all flanges, gasketed joints, and terminal assemblies.
1-minute dry power-frequency voltage test up to test levels specified in GB/T 4109 and IEC 60137.
Conducted inside our shielded high-voltage test hall. Guaranteed PD ≤ 5 pC at 1.05 Um/√3, with type tests measuring < 4 pC even at 1.5 Um/√3 (exceeding IEC 60137 requirements).
Measurement at ambient temperature across test voltages. Capacitance deviation within ±5%, tanδ ≤ 0.004.
Power frequency withstand on voltage tap (2 kV, 1 min) and insulation resistance testing (≥ 1,000 MΩ).
Material & Dielectric Verification
In-House Physicochemical & Dielectric Testing Laboratory
Every batch of epoxy resin, insulating fluid, and condenser core material undergoes strict physicochemical, trace moisture, and dissolved gas chromatography (DGA) verification.
IEC 60567 / GB/T 17623 Dissolved Gas Chromatograph (DGA)
ZF-301 multi-detector gas chromatograph with hydrogen & air generators — verifies zero thermal decomposition or partial discharge gas generation before and after dielectric testing.
IEC 60247 / GB/T 5654 Automatic Tanδ & Volume Resistivity Tester
High-temperature (90.0°C, 2000V) precision dielectric dissipation factor (tanδ) and volume resistivity measurement for insulating media and resin compounds.
IEC 60814 / ASTM D1533 Coulometric Karl Fischer Trace Moisture Analyzer
ZHS1005 trace moisture analyzer measuring ppm-level water content (≤ 5 ppm in oil / < 0.5% in solid insulation) to guarantee deep vacuum drying integrity.
IEC 60156 / GB/T 507 Automatic Breakdown Voltage (BDV) Tester
Fully automated 0–80/100 kV dielectric breakdown strength tester verifying raw insulating fluid and test-tank medium strength (≥ 70 kV / 2.5 mm).
IEC 60567 Pre-Treatment Constant-Temperature Degassing Oscillator
ZhongFen 1081-II automatic constant-temperature shaker for quantitative extraction of dissolved characteristic gases prior to DGA chromatography.
Independent Certification
Third-Party Type Test Records (CTQC)
Our dry-type capacitor bushings have been tested by the China National Transformer Quality Inspection and Testing Center (CTQC).
| Voltage Class | Representative Model | Product Category | Inspection Body & Report No. |
|---|---|---|---|
| 550 kV | EBRGL-550/1250 | Porcelain Transformer | CTQC ZJ-2015-0867 |
| 550 kV | EGRG-550/5000 | GIS Bushing | CTQC ZJ-2015-0868 |
| 363 kV | FGRG-363/5000 | GIS Bushing | CTQC ZJ-2021-5152 |
| 363 kV | FBRGL-363/1250 | Composite Transformer | CTQC ZJ-2016-1029 |
| 252 kV | FBRGL-252/5000 | Composite Transformer | CTQC ZJ-2023-2009 |
| 252 kV | PEGRG-252/3150-4000 | RIP GIS Bushing | CTQC ZJ-2020-2177 |
| 252 kV | FB(G)RG-252/4000 | RIF Dry-Type Transformer/GIS | CTQC ZJ-23.0532 |
| 126 kV | FBRGL-126/4000 | Composite Transformer | CTQC ZJ-2019-2038 |
| 126 kV | FB(G)RG-126/4000 | RIF Dry-Type Transformer/GIS | CTQC ZJ-23.0533 |
| 126 kV | ECRG-126/3150 | Wall Bushing | CTQC ZJ-2016-1027 |
| 72.5 kV | FBRGL-72.5/4000 | Composite Transformer | CTQC ZJ-2019-2037 |
| 72.5 kV | FB(G)RG-72.5/4000 | RIF Dry-Type Transformer/GIS | CTQC ZJ-23.0534 |
| 40.5 kV | (P)EBRG-40.5/25000 | High Current Bushing | CTQC ZJ-2022-5037 |
* All ISO 9001/14001/45001 management certificates and CTQC third-party type test reports are maintained across our two production bases (Beijing headquarters and Hunan manufacturing base). Complete PDF copies in English or Chinese are provided upon project qualification request.
Require Specific Test Protocols or Drawings?
Our engineering team can provide type test reports matching your exact substation or transformer parameters.