RIP vs RIF Bushings: What the Core Material Really Changes

RIP and RIF bushings differ mainly in the core material and how it handles moisture. Engineers and buyers get the conditions for choosing each core and the documents that confirm it.

Transformer condenser bushing beside brown paper and pale glass-fibre winding specimens

RIP and RIF bushings use dry, resin-cured condenser cores wound from crepe paper or glass fibre.

Choose the fibre core (RIF) when moisture exposure before service is hard to control, and RIP when the bushing goes into service soon with its packing intact. Both are dry, resin-cured condenser cores; the main difference is what the core is wound from, crepe paper in RIP and glass fibre in RIF. Paper takes up moisture, so storage, transport and humid sites decide the choice. We make both cores, so this guide sets out how we would choose and what we would check.

  • The paper core (RIP) needs controlled packing and a check before service.
  • The fibre core (RIF) is less sensitive to moisture in storage, but the same pre-service tests apply.
  • An acronym on an offer does not tell you the core on its own.
  • Datasheet limits measured at different voltages do not rank the two cores.
  • Confirm the core on the offer, the drawing and the type-test report of the exact model.

What actually changes when the core is paper or fibre

A condenser core is the insulating body around the conductor. Thin conductive foils are wound into it to spread the electric field evenly from the conductor out to the flange. In an RIP (resin-impregnated paper) core, the layers between the foils are paper. The core is wound first, then impregnated with resin and cured into a solid body. 4 Our RIP process uses electrical crepe paper and a degassed epoxy system under high vacuum.

In an RIF (resin-impregnated fibre) core, glass fibre takes the place of the paper. Our fibre design is a solid, dry capacitive structure wound with glass-fibre reinforcement and semiconductive condenser screens.

Cutaway of an RIP core with crepe paper beside the illustrated RIF design with glass fibre and semiconductive screens
In the illustrated fibre design, glass-fibre winding and semiconductive condenser screens sit where the RIP design uses a crepe-paper winding and grading layers.
Core RIP RIF
Core wound from Crepe paper Glass fibre
Oil in the core None None
Main practical difference Absorbs moisture if exposed Less moisture-sensitive in storage

The housing, the conductor and the rating are separate choices you make for either core.

Two shortcuts are worth dropping. First, RIF is not simply the better core. Paper-free cores have limits of their own: CIGRE TB 887 notes that RIS, resin-impregnated synthetics, another paper-free core, can be limited by voltage class and moulds. 2 That is a note on RIS, not a verdict on RIF, but it is the reason to check that a fibre core exists as a named model at the rating you need. CIGRE also notes that dry RIP and RIS designs remove the oil and pressure behind fire and explosion risk, and that oil-paper designs usually carry more current than dry ones. 2 So current capacity separates dry cores from oil-paper, not RIP from RIF.

Second, a dry core is not maintenance-free. Our own installation guide covers both cores and still calls for periodic tan δ and capacitance checks, and cleaning under heavy pollution. Tan δ, the dissipation factor, measures how much energy the insulation loses; a rising value is the usual sign that moisture or ageing is getting in.

Choose the bushing family first, by what sits on each side of it, as set out in our transformer bushing selection guide. The core material then decides how you store, handle and check it.

RIF, RIS and RIP: confirm what the supplier means

Ask every supplier to name the core material in words, because the acronyms are not used the same way. Three standards texts show the problem.

IEC 60137:2017 defines an RIS (resin-impregnated synthetics) bushing as one whose main insulation is a core wound from synthetics and impregnated with a curable resin. 5 A note to that clause adds that, unless the manufacturer states otherwise, such a bushing is handled as an RIP bushing for the standard's purposes. 5 That is a classification rule inside the standard. It tells you nothing about what an offered core is actually made of, which is why the material has to be written out.

CAN/CSA C88.1-2018 goes the other way and puts resin-impregnated non-hygroscopic fibre and synthetic fabric cores into one definition. 5 A proposed revision of IEEE C57.19.00 would likewise group synthetic and fibre cores that use no paper. 5 These three definitions are quoted here as reproduced in an INMR article contributed by RHM International, a maker of RIF bushings. 5

In our catalogue, the model code tells you the route: a P prefix means RIP, and no P means the fibre core. Paperwork can still carry a different label: the third-party type-test report for our FBRGL-126/4000 prints the sample name as RIF/RIS Bushing.

So go by the full model code and the material written out in words on the offer, the drawing and the report. If one of the three says only "RIF" or "RIS", ask for the core material to be stated.

Project conditions that point toward RIP or toward RIF

Request the fibre core when moisture exposure before service is hard to control. RIP is a sound choice when the bushing goes into service soon after delivery and packing stays intact.

Two branches link a wet freight setting to a glass-fibre core and a sheltered workshop to a paper core
Hard-to-control exposure points toward checking the fibre core first. Paper remains an option with controlled packing and prompt installation. Follow the installation instructions for the offered bushing in either case.

When the fibre core is worth requesting

Spares that sit in a store for years, long or uncertain transport, humid or coastal sites, and installation work that may leave the oil end open all add moisture exposure. Paper is what absorbs that moisture, so a paper core may need a drying cycle and a repeat test after drying. A fibre core does not absorb moisture the same way and is far less likely to need that extra round; the pre-service capacitance and tan δ checks still apply to both. The check that comes with choosing it: make sure the exact rating and housing you need exist as a named fibre-core model.

When RIP is the straightforward choice

When the bushing arrives close to installation and its packing stays intact, moisture risk is easy to manage. Keep the packaging closed until fitting and recheck capacitance and tan δ before service.

Voltage does not decide between them in our range. Our handbook gives separate RIS/RIF and RIP transformer tables, and both run from 12 kV to 550 kV. Our guide applies the same oil-side conditions to both cores: daily-average oil temperature up to 90 °C, and up to +115 °C on short overload.

As noted above, CIGRE TB 887 points to voltage-class and mould limits for RIS, and says oil-paper designs usually carry more current than dry ones. 2 So check the current and housing you need as a named model row, not as a family range. Mechanical strength and seismic duty belong to the offered model, so check them in that model's type-test report and against your project requirement. Ask the supplier for the service record of that model as well; the core name alone says nothing about it.

We make both routes: fibre cores at our Beijing base, and both RIP and fibre cores at our Liling base in Hunan. One installation guide covers both cores. If your supplier makes both, ask in one enquiry whether your rating, current and housing exist as a named model in each core, and where both exist, have them quoted side by side with the same housing and conductor. That saves a second round of quotations and gives you a like-for-like comparison.

What 'dry' does and does not cover on site

Dry describes the core only. The lower end of a transformer bushing still sits in transformer oil, so the oil-side rules apply to both cores. Our guide allows installation angles of 0° to 60°, with steeper angles by special design. How long to let the bushing stand before energising is set out in the storage section below. Where your project has a special agreement, that agreement and the confirmed drawing govern.

When you know which core suits the project, review the bushing options that offer it.

Moisture, storage and handling: where the two really differ

This is where the core material makes a practical difference. Paper absorbs moisture when it is exposed, so an RIP bushing needs controlled packing and a check before service.

Side-by-side view of a protected RIP oil-side end and the same end with its protective cover removed
Keep the RIP oil-side end covered during storage. Exposure can let moisture reach the paper core.

RIP: what exposure does and how it is recovered

Hygroscopic means a material takes up water from the air, and paper is hygroscopic. CIGRE TB 755 reports that an RIP oil-side end left exposed for months absorbs moisture and its tan δ rises. It limits storage in the original packaging to one year and gives drying at 70–80 °C for three to four days, repeatable once, as the recovery step. 1

Before service, capacitance and tan δ are measured again, and CIGRE has RIP bushings stand 1–2 days before energising. 1 Our guide sets the standing time by the filling method: after conventional oil filling, 6 to 24 hours so air bubbles can leave the oil end, and no wait after vacuum filling.

CIGRE's drying figures above are recommendations rather than fixed rules. 1 Our own guide, which covers both RIF and RIP, gives drying at 60 °C for 24 h. For both the standing time and the drying, follow the instructions issued for the model you receive.

Log when each RIP spare goes into storage. Write the packing date on the crate and in the spares register, and keep the covers intact. When the spare is finally needed, you will know whether a drying cycle is due, instead of finding out at the pre-service test.

Fibre core: what changes and what does not

The CSA C88.1 definition describes fibre and synthetic cores as non-hygroscopic. 5 That is why a fibre core is less sensitive to moisture in storage. The rest of the handling stays the same. Our guide applies the same drying and pre-service tests to both cores. For both, it also requires no gap between the top cover and the connecting seat, so water cannot get into the tank. Seals, gaskets and terminals need protection whatever the core is made of.

The full receiving, storage and transport steps are in bushing storage and transport.

Why datasheet PD and tan δ figures do not rank the materials

A lower number in one table does not make one core better, because the figures are often given under different test conditions. PD, partial discharge, is a tiny internal discharge measured in picocoulombs (pC). A PD limit only means something at the voltage it was measured at. Um is the highest system voltage the bushing is rated for, so 1.5Um/√3 is a lower test voltage than Um.

Handbook limits are set at different test voltages

Handbook table PD limit PD measured at Max tan δ
RIS/RIF transformer ≤10 pC Um 0.4%
RIP transformer ≤10 pC 1.5Um/√3 0.6%

The two rows set different maximum limits from separate tables. Their PD figures are taken at different test voltages, Um for the fibre core and 1.5Um/√3 for RIP. These are acceptance limits, not test results, so a smaller tan δ limit in one table does not show that the fibre core performs better.

Our installation guide gives a single tan δ limit of 0.7% for both cores. Two documents from the same maker give different tan δ limits, which is why the source of a figure matters as much as the number.

Our GIS table uses yet another voltage, 1.2Um/√3, with a 5 pC limit.

The rule is simple: compare only figures for the same family, the same test voltage and the same kind of document.

What two same-rating type tests actually measured

Measured results are a different kind of figure, and they can be compared when the conditions match. We hold two type-test reports from the same test centre for the same 126 kV / 4,000 A rating: CTQC/ZJ-25.1529 for FBRGL-126/4000, a fibre core (RIF), and CTQC/ZJ-25.1530 for PFBRGL-126/4000, an RIP core. Each row gives one test on both samples, with its condition.

Test and condition FBRGL-126/4000 (RIF) PFBRGL-126/4000 (RIP)
tan δ at 126 kV, before the type tests, as a ratio (limit ≤0.007, the same as 0.7%) 0.00341 0.00339
Capacitance at 126 kV, before the type tests 434.0 pF 432.6 pF
PD at 126 kV after a 255 kV, 60 s pre-stress (limit ≤10 pC) <3 pC <4 pC
Cantilever load of 4,000 N for 60 s 4,042 N applied, no damage 4,085 N applied, no damage
Highest temperature rise at 4,000 A, at the immersed-end terminal (thermal class E) 61.8 K in a 6 h test, oil at 89.5 °C 66.3 K in a 7 h test, oil at 91.9 °C
Final conductor temperature for 100 kA over 3 s, calculated from the measured rise (limit ≤180 °C) 158.5 °C 163.0 °C

For these two same-rated samples, the reported electrical, thermal and mechanical results were close and within their respective report limits. Both reports put the insulation in thermal class E, the heat-resistance class whose limits the temperature rise is judged against. The first four rows use matching electrical or load settings as listed in the table. The electrical measurements were made under different ambient temperatures, relative humidities and pressures. The two thermal rows come from close rather than identical conditions: the temperature-rise tests ran for 6 h and 7 h with the oil at 89.5 °C and 91.9 °C, and the short-time figure is a calculation that starts from each measured rise, not a short-circuit test.

So the small gaps do not rank the cores. Each report covers one sample and the tests it lists, so the pair does not show that the two cores perform the same across a range.

Because the measured results sit this close, what really separates the two cores is moisture exposure in storage and before service, covered in the sections above, not these figures. Thermal-class figures quoted by individual suppliers are no basis for choosing a core either; ask for the thermal limits stated in the offered model's report.

How to read capacitance and tan δ records over time is covered in reading capacitance and tan delta results.

Documents that show the offered core and what the reports cover

Before you accept either core, check that the offer, the confirmed drawing and the type-test report all name the same full model and core material.

  • Type-test report for the offered design. A type-test report covers only the sample it names and the tests it lists. It cannot be stretched to the whole series, other models or every unit shipped.
  • A matched pair is possible. The two reports compared in the datasheet section are a same-rating pair, one per core. CTQC/ZJ-25.1529 covers FBRGL-126/4000, a fibre core without the P prefix. CTQC/ZJ-25.1530 covers PFBRGL-126/4000, the P-prefixed RIP core. Both were issued by the same test centre on 2025-08-25, and their signed pages state that the listed tests passed. Ask for the same kind of evidence at your own rating.
  • Confirmed drawing. Our handbook dimensions are references; the issued drawing prevails. Check that the drawing revision matches the offer.
  • What a handbook or guide is not. Neither our handbook nor our installation guide is a type-test report. Use them to understand the range and the installation rules, not as proof for a model.
  • Standard citations. IEC 60137:2017 is the standard for separately supplied AC bushings. 3 Citing it tells you which standard applies, not that a model has passed it.
  • Report number in the offer. Ask the supplier to name the report number and sample model next to each offered item. That way you will not discover after award that the report covers another core.

Whether a report applies to your target model is covered in type tests vs routine tests.

Background: RIP, RIF, RIS and OIP in one view

OIP, oil-impregnated paper, is the older core: paper saturated with transformer oil, so the bushing needs oil-level and leak attention. RIP replaces that oil with cured resin. RIS uses synthetic fabric in place of the paper, and RIF uses glass fibre. The difference between RIP and OIP comes down to free oil and the maintenance that comes with it. This page compares the two dry cores, RIP and RIF.

Choose the core by the project's risks, then verify it on paper

Pick the fibre core when the bushing will face long storage, long transport or a humid site, and pick RIP when it goes into service soon with controlled packing. Then make sure the offer, the drawing and the type-test report name the same full model and core. A three-letter acronym or a lower number in a datasheet is not proof of the better choice; the matching documents are.

Next step

Review the Relevant Bushing Options

See our RIP and RIF dry-type bushing families for transformers, GIS and wall duty.

References

  1. CIGRE TB 755, Transformer Bushing Reliability (WG A2.43) — 2019
  2. CIGRE TB 887, Life Extension of Oil Filled Transformers and Shunt Reactors (WG A2.55) — 2022
  3. IEC 60137:2017 (Edition 7.0), Insulated bushings for alternating voltages above 1 000 V — 2017-06-22
  4. Zhao et al., "Design of adaptive bushing based on field grading materials", High Voltage (IET) — 2021-04-09
  5. Euvrard & Middleton (RHM International), "Dry Paperless Bushings for T&D Power Systems", INMR — quoting IEC 60137:2017 cl. 3.11, CAN/CSA C88.1-2018 and a proposed IEEE C57.19.00 revision — Originally published: 2021-10-01; Version read: 2024-05-16

How this guide was prepared: Prepared by ZLVOLT engineering from our CTQC type-test reports (CTQC/ZJ-25.1529 and CTQC/ZJ-25.1530), our handbook and installation guides, and the standards and publications listed above. The confirmed drawing and the project technical agreement decide the final design. Content date: November 2026.