Two bushing capacitance and tan delta records can be compared only when four conditions match. They need the same circuit mode and winding connections, an uncrated, clean, dry bushing at a stable temperature, values normalised to 20 °C, and a baseline from that same unit. 7 If one of the four differs, the gap between two records may be a test artefact, not an insulation fault. This guide gives that check order first, then the limits for new and in-service bushings.
- New bushings at 20 °C: IEC 60137 caps OIP and RIP tan delta below 0.7%; IEEE C57.19.01 sets RIP power factor below 0.85%. 7
- In service, compare with the unit's own start value: at 20 °C, the CIGRE bands reach Extreme above 2× initial tan delta for OIP and above 1.76× for RIP. 7
- One shorted foil is a small step: on fine-graded RIP designs, C1 rises approximately 12% at 72.5 kV but only 1.9% at 550 kV. 5
- Site tests need preparation: one dry-bushing manufacturer's installation practice (2025) is to uncrate, wait more than 12 h, then test C1 by UST at 5–10 kV.
We make oil-free dry-type RIP and RIF condenser bushings, so some examples below come from our own test documents. The wider set of guides sits in our bushing knowledge hub.
Which Four Conditions Must Match Before Comparing C1, C2, and Tan Delta?
Each condition blocks a different way a reading can move while the insulation stays the same. Check all four before you call a change a fault.
The rules here are for condenser-graded bushings tested offline at power frequency. IEC 60137:2017 covers bushings for AC equipment above 1,000 V at 15–60 Hz. 8
Four Pre-Comparison Checks: Circuit Mode, Uncrated Clean State, 20 °C Reference, and Unit Baseline
Use this checklist on both records before you compare them.
- Same circuit mode and winding connections. C1 is measured in UST mode and C2 in GSTg mode. On a transformer, tie the same-voltage winding terminals together to the test supply, earth the other windings and close the tap covers of the other bushings. A 2006 IEEE Transactions on Power Delivery study shows why: if the same-voltage terminals are not tied, stray current between winding and foil enters the measuring circuit and the power factor reads high. It also has the neutral of a grounded wye winding lifted, because zero-sequence current could otherwise exceed the test set's capacity. 12
- Uncrated, clean, dry and at a stable temperature. One dry-bushing manufacturer's installation practice for RIP and RIS dry bushings (2025) lifts the bushing out of its wooden crate and removes the protective cover. It allows more than 12 h for temperature balance and records temperature and humidity. C1 is then measured by UST at 5–10 kV and 50/60 Hz before it is compared with the nameplate.
- Normalised to 20 °C. Tan delta moves with temperature, so compare values corrected to 20 °C with the curve for that bushing type. 7 Capacitance moves far less with temperature, but a single-foil step is small at the highest voltage classes, so record the test temperature with every C1 reading as well.
- Compared with the same unit's baseline. Use that serial number's stamped nameplate value or its post-installation fingerprint, never a catalogue value. Each bushing has its own measured C1 and tan delta on its routine test certificate.
Why spend time on this? Tan delta is the test that finds faults early. In the failure survey reported in CIGRE TB 755, tan delta or power factor tests flagged 45% of incipient failures: 27% by classic power-frequency tests and 18% by frequency-domain spectroscopy. Capacitance alone flagged 2%. 6 In the same survey, bushings on diagnostic intervals of 4 years or less made up 66% of the incipient failures but only 36% of the terminal ones. 6 A reading you cannot compare wastes that advantage.
Keep two baselines apart. A new bushing delivered for handover is compared with its factory nameplate. Once it sits in the transformer turret, the turret, the corona shield, the current transformer and the phase spacing all change the measured capacitance. One dry-bushing manufacturer's installation guidance therefore treats the first measurement after mounting as the trend fingerprint, which is more precise than the nameplate. After that test, the tap cover goes back on at the specified torque so the tap layer stays earthed. The first site test will show a geometry offset from the free-air factory value, and that offset can be larger than a single-foil step. File the two baselines separately and trend future tests against the fingerprint.
Take the fingerprint before first energisation. Do it right after the bushing is mounted and the oil is filled, with the current transformer and corona shield in place. Log top-oil and ambient temperature with the result. This removes later false alarms caused by the difference between factory free-air tests and the turret. For our bushings, allow 6–24 h after non-vacuum oil filling before energising; no wait is needed after vacuum filling. That wait is an energising rule, not a condition for comparing test records.
What C1 (UST) and C2 (GSTg) Actually Measure—and Why 2 kV Test Taps Differ from 20 kV Potential Taps
A condenser bushing has two insulation zones that you test separately.
- C1 is the main insulation. It runs from the high-voltage conductor to the tap layer. On a test tap, that is the outermost foil. In UST (ungrounded specimen test), voltage goes on the conductor and current is measured from the tap. Current to the flange and tank is not measured, so C1 reads clean of those stray paths.
- C2 is the tap insulation. It runs from the tap layer to the earthed mounting flange. In GSTg (grounded specimen test with guard), voltage goes on the tap and the conductor is connected to the guard, so only C2 is measured.
The tap itself comes in two designs. A dry-bushing manufacturer's installation guidance published in 2025 describes the 2 kV test tap of IEC 60137 and the 20 kV potential tap of IEEE as different designs. On a 2 kV test tap, C2 is a mix of insulation layers, resin and air. In service the tap is earthed, so C2 carries no stress and its reading is for reference only. According to that guidance, IEC gives limits for C2 and IEEE sets none.
The same guidance limits that reference-only rule to the 2 kV test tap. On a 20 kV potential tap, C2 belongs to the main insulation, so judge it like C1. On a 2 kV test tap, C2 is measured at a much lower AC voltage than C1: keep the AC test voltage for C2 within the tap's 2 kV rating. That limit applies to the AC measurement; the DC insulation-resistance check of the tap is a separate test.
Tan Delta vs. Power Factor (cos θ): When the Numbers Match and When They Diverge
Tan delta and power factor measure the same loss in two ways. Tan delta is the resistive current divided by the capacitive current. Power factor (cos θ) is the resistive current divided by the total current.
For the low losses of healthy bushings, the two numbers are practically equal. They only drift apart at loss levels far above any acceptance limit. IEC reports use tan delta and IEEE reports use power factor, so check which one a record states before you compare it with a limit.
New-Bushing Acceptance Limits: IEC 60137 vs. IEEE C57.19.01 by Insulation Type
A new bushing passes on tan delta, or power factor, when its 20 °C value at 50/60 Hz sits under the limit for its insulation type in the standard your contract names. 7 The type matters as much as the standard. OIP is oil-impregnated paper, RIP is resin-impregnated paper, and RBP is the older resin-bonded paper.
20 °C Standard Ceilings for OIP, RIP, and RBP—and How RIS and RIF Bushings Are Accepted
| Insulation type | IEC 60137 tan delta | IEEE C57.19.01 power factor | Typical new value |
|---|---|---|---|
| OIP | < 0.7% 7 | < 0.5% 7 | 0.2%–0.4% 5 |
| RIP | < 0.7% 7 | < 0.85% 7 | 0.3%–0.4% 5 |
| RBP (legacy) | < 1.5% 7 | < 2% 7 | 0.5%–0.6% 5 |
All values are at 50/60 Hz and 20 °C, as summarised by CIGRE TB 962 (2025) and TB 755. 7
For partial discharge, CIGRE TB 755 Table 2.1.1 compares the three insulation systems: ≤ 5 pC and ≤ 10 pC for OIP and RIP/RIS, against ≤ 100 pC and ≤ 250 pC for RBP. 3 Treat that pair as a comparison between insulation types. The PD acceptance limit and its test voltage come from the standard your contract names and the bushing's routine test report.
Watch the IEEE column. Its OIP ceiling is tighter than its RIP ceiling, so judging an RIP bushing by the OIP figure can fail a unit that meets its own RIP limit.
These are factory and commissioning limits only. CIGRE TB 962 states that the dissipation factor criteria hold only at 20 °C, and that IEC 60137 and IEEE C57.19.01 factory acceptance limits must not be used to retire bushings in service. 7 In-service bushings are judged against their own initial values instead.
The standard values in the table are listed for OIP, RIP and RBP. Two newer dry cores need their own rule:
- RIS (resin-impregnated synthetic). A dry-bushing manufacturer's technical article notes that IEC 60137:2017 treats RIS like RIP unless stated otherwise. In that case the RIP line of the table applies. For reference, one synthetic-core manufacturer reports a typical C1 tan delta of 0.25%–0.4% for its own new RIS product family, measured at 10 kV and normalised to 20 °C. That is one product family's figure, not an industry acceptance value.
- RIF (resin-impregnated fibre). Check an RIF bushing against the limit stated in its manufacturer's documentation and in its IEC 60137 type-test report. When one synthetic-core manufacturer described its factory tests, it said such cores sat outside the IEEE standards it discussed, with acceptance criteria set by the manufacturer.
For our 12–550 kV RIF and RIP bushings, the general electrical parameters are tan delta ≤ 0.7% and partial discharge ≤ 10 pC at Um, the highest voltage for equipment that the bushing is rated for. For the differences between the two dry cores, see RIP vs RIF bushings.
Healthy new cores sit well below these ceilings. In an independent type test by CTQC (CNAS L0681) on one of our 252 kV / 4000 A RIF designs, C1 measured 503.0–503.6 pF. Main tan delta stayed at 0.340%–0.348% through the type and routine tests, and partial discharge stayed below 4 pC. The same report shows the test tap passing 2 kV for 60 s, with a tap tan delta of 0.390%. Those figures belong to that tested design only. For what such a report does and does not cover, see bushing type tests vs routine tests.
A dry core holds no oil or SF6. The transformer or GIS it serves still does, and the bushing still needs handover tests and periodic C1 and tan delta tests.
Ask for measured values per serial number. At purchase specification review and factory acceptance sign-off, require each certificate to show that bushing's measured main capacitance and tan delta, not a catalogue nominal value. Check each serial number's capacitance against its own nameplate, and record that exact pF figure as the unit's handover baseline. After installation, the first reading in the turret becomes the fingerprint for in-service trending. This stops normal manufacturing spread from being mistaken for a shorted grading layer at commissioning.
We would keep both numbers on file. The standard or manufacturer limit only sets the pass line, for example below 0.7% for RIP under IEC. 7 The unit's own measured value, typically 0.3%–0.4% for a healthy new RIP core, is what makes trends sensitive for decades of service. 5
The ±5% Handover and Preventive-Test Deviation vs. the Unit’s Handover Baseline and Installed Fingerprint
For our bushings, handover and preventive tests follow DL/T 596. Capacitance must deviate by no more than ±5%, main tan delta must be ≤ 0.007, and tap insulation resistance must be ≥ 1000 MΩ with a 2500 V megohmmeter.
That ±5% is a deviation limit for test records, measured against the unit's factory or previous value. It is not a design or catalogue tolerance. It also does not prove the core is intact. At higher voltage classes, one shorted foil moves C1 by less than 5%, as the single-foil step table in the in-service thresholds section shows.
On site, C1 can also differ from the nameplate because of temperature, mounting and stray coupling. A dry-bushing manufacturer's installation guidance puts the weight on consistency: bushings of the same group, measured the same way, should deviate by a similar amount. So compare the group first, then judge the single bushing.
Utilities also set their own field bands. Authors from Mexico's national utility CFE report that its 2007 substation manual lets C1 and C2 each move up to 2% either way from that unit's original value.
Note: Factory acceptance limits and handover limits answer different questions. The first asks whether a new bushing meets its standard at 20 °C. 7 The second asks whether a site reading still matches the unit's own record.
Specifying dry RIP or RIF bushings? Ask for routine test certificates listing each unit's own measured capacitance and tan delta as its handover baseline.
In-Service Degradation Thresholds: CIGRE TB 755 Multipliers and Single-Foil C1 Jumps
In service, judge a bushing by how far its 20 °C tan delta has moved from its own initial value, and by whether C1 has jumped by one foil step. 7 Fixed absolute limits from the factory no longer apply once the bushing is in service.
Relative Tan Delta Multipliers at 20 °C (Good, Moderate, Severe, Extreme) and the ≤0.8× Drop Warning
CIGRE TB 962 takes four bands from TB 755 Table 5.2.2.2.2. Each band is a multiple of the bushing's initial tan delta at 20 °C. 7 The last row adds the TB 755 warning for a falling OIP value, which overrides the Good band. 5
| Band | OIP | RIP | Action |
|---|---|---|---|
| Good | ≤ 1.33× 7 | ≤ 1.25× 7 | Keep the normal test interval |
| Moderate | 1.34–1.66× 7 | 1.26–1.5× 7 | Visual check, retest within 1 year, continuous monitoring advised 5 |
| Severe | 1.67–2× 7 | 1.51–1.75× 7 | Visual check, retest within 1 month, continuous monitoring advised, consider retirement 5 |
| Extreme | > 2× 7 | > 1.76× 7 | Retire, or keep in service short term (about 1 month) under continuous monitoring 5 |
| Drop (OIP) | ≤ 0.8× 5 | Not listed | Treat as a significant abnormality: check C2 and its tan delta 5 |
RIP bands are narrower than OIP bands. A dry RIP core drifts less in good condition, so a smaller rise already means more.
These bands cover OIP and RIP only. For RIF and RIS cores, which the table does not list, trend the 20 °C tan delta against the unit's own initial value and apply the manufacturer's in-service limits. For our RIF bushings, those are the preventive-test limits of our guide, which follows DL/T 596: the main tan delta limit listed with the new-bushing limits above, and a capacitance deviation within ±5%.
Our RIP bushings take both checks, the RIP bands in the table and the same guide limits. Act on whichever is reached first. A reading still inside the absolute tan delta limit that has reached an RIP band follows that band's action. A reading above that limit is investigated even if its ratio to the initial value is still in the Good band. For RIS from other makers, use that maker's limits. The single-foil C1 step applies to RIP, OIP, RIF and RIS cores alike, so check C1 against the installed fingerprint as well. Legacy RBP bushings fall outside these in-service criteria; judge them by the manufacturer's or utility's own limits.
A falling value is not good news either. For OIP, CIGRE TB 755 treats tan delta at or below 0.8× its initial value at 20 °C as a significant abnormality. Check C2 and its tan delta. If the C2 tan delta is rising, replacement is recommended, and the oil's dissolved gas analysis (DGA) often worsens alongside. 5
Note: A very low or negative tan delta can point to a fault, not to excellent insulation. CIGRE session paper 12-106 (1996) describes a 110 kV sealed bushing that read tan delta of -0.034%. When it was dismantled, it showed semiconducting deposits and discharge traces. 1
Plan the outage when the band says so. In the Moderate band, inspect the bushing and schedule a retest within the year; continuous monitoring is advised. In the Severe band, inspect it and retest within the month; continuous monitoring is advised and retirement should be considered. Above the Extreme limit, remove the bushing from service, or keep it in service only short term, for about a month, under continuous monitoring. 5 After a confirmed single-foil C1 step measured offline, replace it. 2 A Severe reading is also the point to get a spare ready. An early outage costs some scheduling effort. A bushing that breaks down in service can take the transformer out for far longer.
Why Fixed Percentage Rules Fail at EHV: Single-Foil Breakdown %ΔC1 from 72.5 kV to 800 kV
A condenser core is a stack of foil layers that act like capacitors in series. When one layer breaks down, two neighbouring foils short together. The stack loses one series element, so C1 rises by one small step.
The more layers a bushing has, the smaller that step. CIGRE TB 755 Table 5.2.2.1.1 gives the approximate step for fine-graded bushings by Um, the highest voltage for equipment: 5
| Um | RIP: C1 rise per shorted foil | OIP: C1 rise per shorted foil |
|---|---|---|
| 72.5 kV | 12% 5 | 8.8% 5 |
| 123 kV | 7.1% 5 | 4.8% 5 |
| 245 kV | 4.2% 5 | 2.7% 5 |
| 420 kV | 2.6% 5 | 1.7% 5 |
| 550 kV | 1.9% 5 | 1.3% 5 |
| 800 kV | 1.3% 5 | 0.9% 5 |
Measured offline, a C1 rise of one step means the bushing should be replaced. With online monitoring, TB 755 raises an alarm at one step and calls for replacement at two. 2 For how online systems track this, see our smart transformer bushing condition monitoring guide.
For a voltage class or design not in the table, ask the manufacturer for the number of series grading elements, N. The step is then roughly 1/(N−1) of C1. Treat that as an estimate. It assumes equal elements and one short, and TB 755 notes that the element count alone gives only an approximation. 5
This is why a reading inside ±5% is not proof of a sound core. Our guide follows DL/T 596 and allows a capacitance deviation of ±5% at handover and preventive tests. Yet one shorted RIP foil adds only 2.6% at 420 kV and 1.9% at 550 kV. 5 A bushing can stay inside the ±5% band with one layer already gone, so track each step against the unit's own baseline.
Flat percentage rules of thumb have the same weakness. One test-equipment supplier's statistical review lists a 5%–10% change in capacitance from baseline as the action limit most users apply. One test laboratory's empirical field guideline for OIP bushings is tighter and treats a capacitance rise of more than 3% over the nameplate or factory value as a cue to look for partial breakdown. Yet one shorted OIP foil at 420 kV moves C1 by only 1.7%, below even that OIP line, so a flat band can pass a bushing that has already lost a layer. 5 The voltage-graded step is the line to use.
Temperature Shifts and Five Field Traps That Cause False Rejections or Tap Failure
Before you reject a bushing on a site reading, rule out temperature and stray paths. Both can move tan delta or capacitance on insulation that is perfectly sound. A loose test tap is the one trap that can turn a test into a failure.
Why Tan Delta Shifts Steeply with Temperature While C1 Barely Moves—and Why OIP Correction Tables Distort RIP/RIF Data
Tan delta changes with temperature, and each insulation type changes by a different amount. CIGRE TB 755 lists typical changes of about 0.3 %/10 °C for OIP, 0.4 %/10 °C for RIP and RIS, and 0.5 %/10 °C for RBP. 3 The same table puts OIP in thermal class A at 105 °C and RIP and RIS in class E at 120 °C. 3
So a correction table built for OIP will distort a reading taken on an RIP or RIF bushing. Normalise to 20 °C with the correction curve for that bushing type. In one manufacturer's published comparison of six bushings, uncorrected readings from a cold site ran well above the 20 °C factory values, and the gap largely closed once corrected.
Capacitance is different. Manufacturer test data published in the industry press show that C1 hardly changes with temperature. If C1 has moved in an offline test at normal temperature, look for another cause.
Five Field Traps: Mounting Stray C, C2 Misuse, Wooden Crates, Wet or Dirty Surfaces, and Ungrounded Test Taps
- Mounting stray capacitance. Earthed metal near the bushing changes C1. Published field cases show that at high voltage classes, a change in mounting height alone can shift C1 by about as much as one foil step. A whole group of new bushings fitted to a GIS or turret can show the same offset from their factory values. An offset shared by the whole group points to the installation. A jump in one bushing alone points to that bushing.
- Judging C1 from C2. One dry-bushing manufacturer's installation guidance is explicit: never use a test-tap C2 reading to diagnose the main insulation. For a 2 kV test tap, the same manufacturer notes that the test environment alone can shift a C2 reading by up to 200%, so one reading cannot support a diagnosis; it judges C2 by comparing several bushings measured under the same conditions. That does not rule out trending one unit's own C2 where a criterion calls for it, such as the OIP drop check covered in the in-service section.
- Testing inside the crate. An IEEE Transactions on Power Delivery study found that testing a bushing in its wooden shipping crate made C1 read low and C2 read high, even when the bushing did not touch the wood. 11 Lift it out first.
- Wet or dirty surfaces. The same study found that moisture and dirt on the sheds pushed C1 and C2 power factor high, low, or even negative. 11 Clean and dry the sheds and the tap cavity, and use a guard collar if surface leakage remains.
- A poorly grounded test tap. A utility survey across South-East Asia linked about 10% of its bushing failures to test-tap problems. Regional experience put most of them down to spring-loaded tap connections: when the spring loses contact pressure over the years or is damaged by surges, the outer foil can float and arc until the bushing breaks down.
Make tap grounding a sign-off line. Do it right after you disconnect the test lead from the tap, at the end of every offline dielectric test. Inspect the tap cavity for moisture, check that the grounding spring or contact seats cleanly, and torque the weatherproof cap with its O-ring in place. Only then remove the safety grounds from the transformer. This prevents floating-potential arcing on the outermost grading layer once voltage is back on.
Separating these traps from a real fault takes some time. Uncrating, cleaning and waiting for temperature balance can take most of a day under the dry-bushing installation practice described earlier, which sets a long wait for temperature balance. It is still cheaper than returning a sound bushing or repeating a crane lift.
Five-Step Verification Workflow When C1 or Tan Delta Fails—and When to Run DFR
When a bushing fails a C1 or tan delta check, work through five steps in order before you condemn it. The first three remove test errors. The fourth narrows down whether moisture or damage is the likely cause. The fifth decides between drying and retirement.
Steps 1–3: Lead & Winding Check, Uncrated Surface Guarding, and 20 °C Sibling Comparison
- Check the leads and the winding connections. Confirm the test set is in UST mode for C1 or GSTg mode for C2, with the leads on the right terminals. On a transformer, tie the same-voltage winding terminals together to the test supply, earth the other windings, close the tap covers of the other bushings and lift the neutral of a grounded wye winding.
- Remove surface and crate effects. Make sure the bushing is out of its crate. Clean and dry the sheds and the tap cavity. If surface leakage persists, fit a guard collar on the shed and connect it to the guard terminal so that the leakage current bypasses the measurement.
- Normalise and compare. Correct tan delta to 20 °C with the curve for that bushing type. 7 Then compare it with the unit's own baseline and with the sibling phases tested the same day. A shift shared by all three phases points to the set-up. A shift in one phase points to that bushing.
A reading that still fails after these three steps needs a closer look at the insulation itself.
Step 4: Escalating from 50/60 Hz Single-Point PF to 1 kHz–10 mHz DFR (IEEE C57.12.200-2022)
Run dielectric frequency response (DFR) when power-frequency tan delta stays high but C1 shows no single-foil step. A single-frequency power factor test runs at 50 Hz or 60 Hz at 10 kV, or lower where the bushing's rating is lower, takes less than 1 min, and screens for overall degradation. 10 DFR sweeps typically from 1 kHz down to 10 mHz at 140 V rms or more and takes several minutes. Its spectrum separates moisture from high conductivity. 10
When the measurement itself is valid, IEEE C57.12.200-2022 lists five causes of a high or abnormal C1 DFR trace: 9
- high moisture in the solid insulation;
- high oil conductivity from ageing or overheating;
- X-wax deposits and carbonised tracks;
- heavy surface leakage or a badly degraded C2;
- shorted condenser layers.
For RIP and OIP, CIGRE TB 962 adds a low-frequency moisture screen at 20 °C. A 1 Hz tan delta below 0.4% is good, and above 1.25% needs inspection. At 50 Hz or 60 Hz, the matching levels are below 0.5% and above 1%. 7 These 1 Hz values are given for RIP and OIP only. 7 For RIF and RIS cores, compare the DFR curve with the unit's earlier curve and with its sibling units.
DFR is slower than a power factor check: one cycle at 10 mHz alone lasts 100 s. 10 In exchange, it narrows down the likely cause without opening or dismantling the bushing. Confirm that cause against the unit's baseline and sibling readings before choosing between drying and retirement.
Step 5: Controlled Drying vs. Retirement—and Final Tap Grounding Sign-Off
Dry the bushing when DFR points to reversible moisture at the surface or the oil end. Retire it when the evidence shows a punctured foil or carbonised tracks.
Drying rules differ between general guidance and the manufacturer's manual, and the manual takes priority. For an RIP bushing whose oil end has absorbed moisture, the general advice in CIGRE TB 755 is drying at 70–80 °C for 3–4 days. After drying, the bushing rests for 1–2 days before energising, with C1 and tan delta retested. Drying may be repeated once; if the bushing still fails, it is scrapped. 4
Resin systems differ, so follow the specific manufacturer's manual where there is one. For our bushings, dry at 60 °C for 24 h. Then retest main tan delta, which must be ≤ 0.007, capacitance, which must stay within 5% either way of its reference, and tap insulation resistance, which must be ≥ 1000 MΩ at 2500 V. A capacitance inside that band can still hide one shorted layer, so also compare C1 with the installed fingerprint for the single-foil step of its voltage class, and recheck tan delta at 20 °C against the initial value. Hold the bushing for review if any reading stays unresolved.
Oil-end moisture can start in storage. For RIP bushings, TB 755 suggests keeping them in their original packing for no more than 1 year. 4 For receiving and storage checks, see transformer bushing storage and transport.
Whatever the outcome, finish by refitting the tap cap at its specified torque and confirming the tap is earthed before the bushing goes back into service.
After these five steps, most failed records end in one of three outcomes: a test error that clears on retest, moisture that clears after drying, or internal damage that calls for replacement. A record that none of these explains stays on hold for review with the manufacturer.
Judge Bushing Dielectric Records by Same-Condition Baselines and Voltage-Graded Steps
Three rules decide whether a capacitance and tan delta record means anything, and they work in this order.
First, make the two records comparable. They need the same circuit mode and winding connections, an uncrated, clean and temperature-balanced bushing, values normalised to the reference temperature, and the unit's own baseline.
Second, judge a new bushing by the limit for its insulation type. Use the IEC 60137 or IEEE C57.19.01 values for OIP, RIP and RBP. For RIF, use the limit in the manufacturer's documentation and IEC 60137 type-test report. Check each serial number's factory values at handover, then record the first post-installation reading as its fingerprint.
Third, judge an in-service bushing by how far it has moved from its own start values. Compare C1 with the installed fingerprint for the single-foil step of its voltage class. Judge tan delta, normalised to the reference temperature, against the initial value: use the CIGRE TB 755 relative multipliers for OIP and RIP, and the manufacturer's in-service limits and the unit's own trend for RIF and RIS. For our RIP bushings, apply both the multipliers and our guide's limits, and act on whichever is reached first. Legacy RBP bushings follow their manufacturer's or utility's own limits. Do not rely on a flat percentage rule. A reading that passes a wide band can still hide one shorted layer.
References
- CIGRE Session Paper 12-106 (1996): Bushing Insulation Monitoring in the Course of Operation — 1996
- CIGRE Technical Brochure 755 (WG A2.43): Tan Delta and Capacitance Retirement Criteria — 2019
- CIGRE Technical Brochure 755 (WG A2.43): Transformer Bushing Reliability — Table 2.1.1 Basic Properties — 2019
- CIGRE Technical Brochure 755 (WG A2.43): Bushing Storage and Moisture Ingress Rules — 2019
- CIGRE Technical Brochure 755 (WG A2.43): Transformer Bushing Reliability, Tables 5.2.2.1.1, 5.2.2.2.1 and 5.2.2.2.2 — 2019
- CIGRE Technical Brochure 755 (WG A2.43): Diagnostic Method Detection Share and Intervals — 2019
- CIGRE Technical Brochure 962 (WG A2.69): Guide for Transformer Maintenance — Bushing Test Criteria — 2025
- IEC 60137:2017 Insulated bushings for alternating voltages above 1 000 V — 2017-06-22
- IEEE Std C57.12.200-2022 Clause 8.5 Abnormal C1 DFR Trace Causes — 2022
- IEEE Std C57.12.200-2022 Guide for the Dielectric Frequency Response Measurement of Bushings (Table 1) — 2022
- IEEE Transactions on Power Delivery: Bushing Power Factor Test Error Sources (Wet Surface & Wooden Crate) — 2006-07
- IEEE Transactions on Power Delivery: Bushing Power Factor Test Wiring on Transformers — 2006-07
How this guide was prepared
Prepared by ZLVOLT. Based on 12 cited sources listed in References. Content date: 2026-11-23.