Environmental Factors Guide

Bushing Creepage Distance and Altitude: What to Specify

Bushing creepage distance and altitude: compare IEC and IEEE creepage in millimetres, correct arcing distance with IEEE factors and check the drawing.

An outdoor condenser bushing with grey sheds, partly coated with wet salt and grime, above a bolted flange, with a substation gantry and snow-covered mountains behind it.

Pollution mainly sets how much creepage distance a bushing needs, and altitude mainly sets how much arcing distance it needs, so calculate the two separately and confirm both on the drawing. 6 10 Mixing them into one figure hides the mistake that matters most at a high or dirty site: one of the two lengths is too short.

  • Creepage starts from the site. On an IEEE basis, creepage is 28 mm/kV for light and 44 mm/kV for heavy contamination, counted on nominal line-to-ground voltage. 11
  • Altitude lengthens the air path. The IEEE air-strength factor at 3000 m is 0.80, so the 1000 m arcing distance is divided by 0.80. 10
  • The table has an end. The IEEE factors correct air only and stop at 4500 m. 10
  • Silicone is not an automatic discount. Accept less creepage on a silicone housing only with a written basis.

We make oil-free dry-type condenser bushings, which grade the voltage inside a solid core of resin-impregnated paper (RIP) or resin-impregnated fibre (RIF). These two lengths decide how tall the outdoor end becomes. For interfaces, voltage and current, see transformer bushing selection. The other guides are in our bushing knowledge hub.

Which Bushing Dimension Does Pollution or Altitude Change?

Side view of a bushing air end: a blue line follows every shed surface from the top metal cap to the flange, and an amber line runs through the outside air between the same metal parts.
Creepage distance follows the shed surface; arcing distance is the shortest path through the outside air.

A dirty surface leaks along the surface. Thin air breaks down through the air. These are two different paths, so they need two different lengths.

Four Dimensions and What Drives Each One

Dimension Where it runs What sets it Changed by pollution? Changed by altitude?
Creepage distance Along the insulator surface 8 Operating voltage and site pollution 6 Yes, mainly Only where the pollution procedure includes it 5
Arcing distance Through the air outside the insulator 8 Required withstand levels No Yes, mainly 10
Installed clearance Through the air from live parts to tank, turret or structure Insulation coordination and layout No Yes, checked with the equipment
Internal insulation Inside the solid core, the oil side or an enclosed SF6 side Rated voltage and its own withstand, thermal and test limits No Not by the IEEE altitude factors 10

Creepage distance is the shortest distance along the surface between two parts that normally have the operating voltage between them, or the sum of such distances. 8 Arcing distance, also called dry arcing distance, is the shortest distance through the air outside the insulator between those metal parts. 8

Why do pollution and altitude act only on the outside? IEEE Std C62.82.1-2010, the general standard for insulation coordination, describes external insulation as the outside air plus the exposed solid surfaces, so weather, dirt and humidity reach it. 14 In the same standard, internal insulation is the solid, liquid or gas part that is shielded from them. 14 It does not name bushings, so the levels for a bushing come from its own equipment standard. 14

Wetting is the link that many specifications skip. Dry dust conducts little. When salt or dust gets wet, it can form a continuous path, leakage current rises, and flashover becomes more likely. Judge dirt and wetting together.

Why More Creepage Cannot Replace the Altitude Correction

Deeper or denser sheds make the surface path longer. They leave the straight line through the air between the metal parts as it was. The IEEE altitude method enlarges that air line, so extra creepage does not stand in for it. 10

The altitude example in Electric Power Transformer Engineering (second edition, 2007) follows the same logic. It lengthens only the air-side insulator for altitude and leaves the rest of the bushing alone. 3

One caution before you call creepage safe from altitude. IEC TS 60815-1:2025 lists an altitude correction among the steps from a reference creepage figure to the figure for the actual insulator. 5 The 2008 part for polymer insulators also applies correction factors for altitude. 7 If your contract uses that series, check the altitude step there as well.

On the drawing: ask for both distances as separate lines whenever a drawing or datasheet gives a single insulation length. Request total creepage distance and dry arcing distance in millimetres, each marked between the same live and earthed metal parts. This stops a long creepage figure from hiding a short air path.

How Do You Turn Site Pollution Into a Creepage Distance?

Pick one standard, grade the site by its method, and write down the voltage that the mm/kV figure divides by. Then convert everything to millimetres. Two offers are comparable only after that last step.

IEC Route: Site Pollution Class to USCD

IEC TS 60815-1:2025 works in three steps. Assess the site and give it a site pollution severity (SPS) class. Read the reference unified specific creepage distance (RUSCD) for that class. Then correct it for the actual insulator, site and system to get its unified specific creepage distance (USCD). 5

"Unified" means one fixed base. As John Graham sets out in High-Voltage Engineering and Testing (third edition, 2013), creepage is counted per kV of Um/√3. Um is the highest line-to-line voltage of the equipment, so Um/√3 is the highest voltage to ground, and the same figure can be used across systems. 16

What numbers sit behind the classes? The same chapter gives the 2008 procedure for ceramic AC insulators:

SPS class Reference value per kV of Um/√3, 2008 ceramic AC procedure
a, very light 22.0 mm/kV 16
b, light 27.8 mm/kV 16
c, medium 34.7 mm/kV 16
d, heavy 43.3 mm/kV 16
e, very heavy 53.7 mm/kV 16

In that procedure, total creepage equals the reference value multiplied by an altitude factor, a diameter factor and Um/√3. 16 The altitude factor is usually 1. The diameter factor is 1 below 300 mm mean diameter, 1.1 at 500 mm and 1.2 at 700 mm, on a straight line between these points. 16

Use the table to understand the scale, and take project figures from the edition in your contract. The 2025 edition adds class f for extremely heavy sites, and gives no reference value for it. 5

IEEE Route: Measured ESDD to Minimum Creepage

IEEE Std C57.19.100-2025 grades the site by measured salt on the insulator. The measure is equivalent salt deposit density (ESDD), the salt that would give the same conductivity per square centimetre.

IEEE level ESDD, mg/cm² (C57.19.100-2025) Creepage per kV of nominal line-to-ground voltage (2012 edition)
Light 0.03–0.08 13 28 mm/kV 12
Medium 0.08–0.25 13 35 mm/kV 12
Heavy 0.25–0.6 13 44 mm/kV 12
Extra heavy above 0.6 13 54 mm/kV or more 12

The performance standard, IEEE Std C57.19.01-2017, uses the light and heavy figures. It counts 28 mm/kV and 44 mm/kV on nominal line-to-ground voltage, the system voltage divided by 1.732. At 500 kV that gives 8085 mm and 12705 mm. 11 For a medium or extra heavy site, name both the figure and the edition you require.

Measure ESDD at the site. A map label can mislead: fertiliser spray or crop burning can push farmland into a higher class. 13

The two systems grade sites by different evidence. "Heavy" in one is not automatically "class d" in the other, so fix one standard for the whole contract.

Convert mm/kV to Millimetres Before Comparing

Three bases are in daily use, and a bare mm/kV figure does not tell you which one it is.

Where the figure comes from Voltage it divides by
IEEE Std C57.19.01-2017 Nominal line-to-ground 11
IEEE Std C57.19.100-2012, all four levels Nominal line-to-ground 12
IEC USCD and RUSCD, as in Graham (2013) Highest line-to-ground, Um/√3 16
Older IEC specific creepage, as in a 2008 IEEE paper Highest line-to-line, Um 15

The 2008 paper puts two of them side by side. IEEE levels of 28, 35, 44 and 54 mm/kV of rated line-to-ground voltage and older IEC levels of 16, 20, 25 and 31 mm/kV of Um give total lengths that differ by only a few millimetres. 15 The smaller numbers simply divide by a larger voltage.

So the rule for comparing offers is short. Multiply each mm/kV figure by its own reference voltage, and compare total creepage in millimetres.

When you write the enquiry: put the words line-to-ground or line-to-line and the voltage in kV next to every mm/kV figure, then repeat the requirement in millimetres. A bid can no longer look generous only because it divides by a smaller voltage.

How Much Arcing Distance Does Altitude Above 1000 m Add?

On an IEEE project, divide the 1000 m arcing distance by the factor for the site. 10 At 3000 m the factor is 0.80, so the air path becomes 1.25 times as long. 10

IEEE Factors and the Arcing-Distance Multiplier

The factor is the share of air strength that is left, with 1000 m as full strength. The multiplier is our own arithmetic: the 1000 m factor divided by the factor at the site.

Altitude IEEE Std C57.19.00-2023 factor Arcing distance becomes
1000 m 1.00 10 1.00 ×
1200 m 0.98 10 1.02 × 10
1500 m 0.95 10 1.05 × 10
1800 m 0.92 10 1.09 × 10
2100 m 0.89 10 1.12 × 10
2400 m 0.86 10 1.16 × 10
2700 m 0.83 10 1.20 × 10
3000 m 0.80 10 1.25 × 10
3600 m 0.75 10 1.33 × 10
4200 m 0.70 10 1.43 × 10
4500 m 0.67 10 1.49 × 10

Worked example. Loren Wagenaar's bushing chapter in Electric Power Transformer Engineering (second edition, 2007) takes an air insulator of 2.5 m at 1000 m. At 3000 m it divides by 0.8 and gets 3.125 m. 3 The example rests on older ANSI/IEEE guidance and does not check a modern product's geometry, so use it to follow the arithmetic. 3

To run it for your own site, take the arcing distance your insulation level needs at 1000 m, find the altitude row, and divide by the factor. Between two rows, use the higher altitude.

Where the Table Stops: Air Only, Up to 4500 m

Three limits decide whether the result holds.

  • Air only. The factors change nothing on the oil side or in the solid core, and the table must not be used above 4500 m. 10
  • IEEE only. IEC 60137:2017 revised its own procedure above 1000 m. 4 For an IEC project, take the figure from the purchased clause. A factor from another method may be a multiplier, so check before you divide.
  • The whole outline must fit. A longer air end changes height and the space around the terminals. Going up one voltage class does not settle the flange, the lower end or the terminals by itself. Check the complete outline of one configuration.

Our transformer bushing guide states 1000 m as the general service altitude for our RIF and RIP bushings up to 550 kV. A special project follows its technical agreement and the confirmed drawing. To see whether a test report covers a lengthened design, use bushing type tests vs routine tests.

When you send the enquiry: give the supplier the site altitude, the standard and the required insulation level, and ask for the corrected arcing distance in return. That way the correction is made once, by the party who draws the outline.

Silicone or Porcelain Housing, and Can Silicone Use Less Creepage?

Silicone rubber is the stronger choice where wet pollution on the surface is the limiting condition, such as heavy or coastal sites. Keep full creepage unless the basis for a reduction is in writing.

Which Housing for Which Site

Silicone helps because of how water sits on it. On a surface that stays water-repellent, water beads into separate drops. On a wetted surface it joins into a continuous film, and a film with dissolved salt conducts.

A 110 kV test paper shows the effect. With artificial pollution, the composite-housed bushing had a markedly higher 50% flashover voltage curve than the porcelain one. 1 The specimens were oil-impregnated paper bushings at one voltage class, so read it as a comparison of housings.

Porcelain does not depend on water repellency. It is the plain choice where nobody will check the surface after years in service, as long as a cleaning or coating plan is kept. Silicone at full creepage sits between the two: you gain the water-repellent surface and keep the margin if it ages.

When Less Creepage on Silicone Holds, and When It Does Not

IEC TS 60815-1:2025 recognises that a reduced creepage distance may be used for hydrophobicity transfer material (HTM), the group silicone rubber belongs to. 5 "May be used" is a permission with conditions. It carries no fixed percentage.

A 2008 CIGRE paper shows how such a figure arises. Aged and service-aged composite insulators kept more than 25% higher pollution strength than porcelain, and the authors took about 75% of the porcelain creepage as a worked assumption. 2 They also warned that it may not be conservative, and that the advantage rests on the surface staying water-repellent without severe ageing. 2

Length is not always set by pollution either. The same paper notes that on AC bushings, switching impulse governs the housing length up to heavy pollution, so composite gains length only under very heavy pollution. 2 That point concerns the voltage classes where switching impulse governs.

Before you accept less creepage, ask for three things in the technical agreement: the standard clause that allows it, the pollution test method, and the basis used for an aged surface. Record the agreed figure. If the surface behaves differently years later, you can trace why the length was chosen.

Cleaning Limits for Silicone and Porcelain

A housing choice is also a maintenance choice.

  • Both materials. IEEE Std 957-2024 asks you to assess the mechanical load of cleaning on the bushing and its supports first. Energised washing needs the manufacturer's approval. 9
  • Polymer housings. The same guide says modular polymer housings must not be hit by a direct high-pressure stream. 9
  • Our bushings. Our guide forbids washing the sheds with a high-pressure water gun. Its maintenance-free design does not waive periodic capacitance and tan delta (dielectric loss) tests or cleaning at heavily polluted sites.
  • Coated porcelain. The 2012 IEEE application guide warns that a coating can affect tan delta measurements, so keep a reading taken after coating. 12

Handling damage to sheds starts earlier than cleaning. The rules for crates, lifting and storage are in transformer bushing storage and transport.

What Should the Specification State, and How Do You Check the Drawing?

State the site conditions and ask for the results in millimetres. A class name alone leaves the voltage base, the altitude and the air path to guesswork.

What to Write in the Enquiry

Selection starts from the system, the application, the equipment and the site. IEC TS 60815-1:2025 sets its method out from those parameters. 5 Copy this sheet and fill in every line.

  • Standard and edition. One governing standard for creepage and one for altitude.
  • Pollution evidence. Measured ESDD, or the SPS class and how it was determined. Do not use a place name as evidence. 13
  • Voltage base. System voltage, and which voltage the mm/kV figure divides by. In the 2008 IEEE comparison, figures counted on rated line-to-ground voltage and on line-to-line Um look very different but mean nearly the same total length. 15
  • Minimum creepage in millimetres. For scale, 28 and 44 mm/kV on an IEEE 500 kV class mean 8085 mm and 12705 mm. 11
  • Site altitude and required insulation level. Ask the supplier to return the corrected arcing distance.
  • Arcing distance, if you state one. Label it as the 1000 m baseline or as already corrected for the stated altitude, so the correction is made once.
  • Housing material. Silicone or porcelain, and any agreed creepage reduction with its basis.
  • Cleaning limits. For our RIP and RIF bushings with silicone sheds: scheduled cleaning at heavily polluted sites, periodic tan delta and capacitance checks, and no high-pressure water gun.

If a value is missing, mark it unknown, name who will measure it and by when, and ask for the offer on a stated provisional level. An assumed class that turns out wrong means a late redesign.

How to Check the Returned Drawing

  1. Find creepage distance and dry arcing distance as two separate dimensions, both between the same live and earthed metal parts. 8
  2. Check that creepage, arcing distance and altitude correction cite the same standard, edition and voltage base as the enquiry.
  3. Multiply the required mm/kV by its own reference voltage and compare with the creepage on the drawing.
  4. On an IEEE project from 1000 m to 4500 m, check that the 1000 m arcing distance was divided by the factor in IEEE Std C57.19.00-2023. 10 The factor stops at 4500 m and does not change the oil side or the internal insulation. 10
  5. On an IEC project, check the arcing distance against the altitude clause of IEC 60137:2017. Above the range of your standard, use the project agreement.
  6. Check that the lengthened air end still fits the flange, the terminals and the clearances on the equipment.

For our transformer bushings the altitude baseline is 1000 m. Special projects follow the technical agreement and the confirmed outline drawing. For a bushing through a wall, the outdoor and indoor ends see different environments; the product page for wall bushings covers that case.

Next step

Specifying RIP or RIF bushings for a polluted or high site? Send the completed sheet and ask for creepage and arcing distance as separate lines.

Calculate Creepage and Arcing Distance Separately, Then Confirm Both on One Drawing

External insulation needs two separate answers, and they come in a fixed order.

Start with pollution, which mainly sets creepage: site evidence and one stated voltage base give the length. Then take altitude, which mainly sets the air path: the required withstand level and the factor of your standard give the arcing distance. Extra creepage does not make up for a short air path, and a long air path does not clean a dirty surface.

Decide the housing after both lengths are known. Silicone helps at wet, dirty sites while its surface stays water-repellent, and any shorter creepage needs a written basis. The oil side, an enclosed SF6 side and the solid core are judged under their own conditions.

The job is done when one confirmed drawing shows both lengths, each with its standard, edition and basis. If either line is missing, the order is not ready to release on external insulation.

References

  1. Study on Pollution Flashover Performance of Transformer Bushing (110 kV, IEEE conference paper)
  2. CIGRE Session Paper A3-307 (2008): Application of Composite Housing to High-Voltage Bushings — 2008
  3. Electric Power Transformer Engineering, Second Edition, Chapter 12 Electrical Bushings (Loren B. Wagenaar) — 2007
  4. IEC 60137:2017 Insulated bushings for alternating voltages above 1 000 V (public redline preview) — 2017-06
  5. IEC TS 60815-1:2025 Selection and dimensioning of high-voltage insulators for polluted conditions, Part 1 (public preview) — 2025-11-24
  6. IEC TS 60815-1:2025 — official public description — 2025-11-24
  7. IEC TS 60815-3:2008 Polymer insulators for a.c. systems (public preview) — 2008
  8. IEC 61462:2023 — public 14-page preview, definitions 3.9–3.10 — 2023
  9. IEEE Std 957-2024 Guide for Monitoring, Managing, and Cleaning of Contaminated Insulators — 2024
  10. IEEE Std C57.19.00-2023 General Requirements and Test Procedure for Power Apparatus Bushings (Table 1) — 2023
  11. IEEE Std C57.19.01-2017 Performance Characteristics and Dimensions for Power Transformer and Reactor Bushings (Table 1) — 2017
  12. IEEE Std C57.19.100-2012 Guide for Application of Power Apparatus Bushings — 2012
  13. IEEE Std C57.19.100-2025 Guide for Application of Power Apparatus Bushings (Table 1) — 2025
  14. IEEE Std C62.82.1-2010 Insulation Coordination: Definitions, Principles, and Rules — 2010
  15. Dimensional standards for bushings applied to liquid filled power transformers and reactors (IEEE paper, 2008) — 2008
  16. High-Voltage Engineering and Testing, 3rd ed., Chapter 12 Bushings (John S. Graham) — 2013

How this guide was prepared

Prepared by ZLVOLT. Based on 16 cited sources listed in References. Content date: 2026-11-25.