Reference Project · Thermal Power
550kV Bushings for the Zhongmei Yongcheng 2×1000MW Ultra-Supercritical Power Unit
550kV RIP Transformer Bushing (EBRGL-550/630) · 3 sets
Illustrative application scene Project Overview
For the 2×1000MW ultra-supercritical power plant in Yongcheng, Henan, the generator transformers were fitted with Zhonglian Kechuang 550kV RIP/RIF dry-type condenser bushings (EBRGL-550/630). The project demonstrates that domestically engineered dry-type bushings meet the insulation reliability, partial discharge and mechanical requirements of the highest voltage class in service today.
Bushing Families Used in This Project
Similar Reference Projects
Wind + Solar 363kV Bushings in Bulk for Huaneng Qingyang Wind-Solar Hybrid Demonstration (Lot A2) 363kV RIP Transformer Bushing (FBRGL-363/800) · 42 units View project → Solar 330kV Class Bushings for the 2GW Guoneng Ningdong Integrated Energy PV Base (No.2 Booster Station) 363kV RIP Transformer Bushing (EBRGL-363/800) · 24 units View project → Energy Storage 252kV Bushings for the Huaneng Gongzhuling 235MW/470MWh Grid-Scale Storage Station 252kV RIP Transformer Bushing (FBRGL-252/630) · 3 sets View project →
Engineering Guides for Similar Projects
Similar project?
Have a project like this one?
Share your specifications and get a reference case matched to your requirements.