Reference Project · Wind + Solar
363kV Bushings in Bulk for Huaneng Qingyang Wind-Solar Hybrid Demonstration (Lot A2)
363kV RIP Transformer Bushing (FBRGL-363/800) · 42 units
Illustrative application scene Project Overview
The Huaneng Qingyang demonstration base combines wind and solar generation at gigawatt scale. In lot A2 alone, 42 units of FBRGL-363/800 transformer bushings were supplied through Jiangsu Huapeng Transformer, underlining the series production capability of the 363kV dry-type range.
Bushing Families Used in This Project
Similar Reference Projects
Thermal Power 550kV Bushings for the Zhongmei Yongcheng 2×1000MW Ultra-Supercritical Power Unit 550kV RIP Transformer Bushing (EBRGL-550/630) · 3 sets View project → Solar 330kV Class Bushings for the 2GW Guoneng Ningdong Integrated Energy PV Base (No.2 Booster Station) 363kV RIP Transformer Bushing (EBRGL-363/800) · 24 units View project → Energy Storage 252kV Bushings for the Huaneng Gongzhuling 235MW/470MWh Grid-Scale Storage Station 252kV RIP Transformer Bushing (FBRGL-252/630) · 3 sets View project →
Engineering Guides for Similar Projects
Similar project?
Have a project like this one?
Share your specifications and get a reference case matched to your requirements.