330kV Class Bushings for the 2GW Guoneng Ningdong Integrated Energy PV Base (No.2 Booster Station)
363kV RIP Transformer Bushing (EBRGL-363/800) · 24 units
Illustrative application scene Project Overview
The Ningdong integrated energy base in Ningxia combines 2GW of photovoltaic capacity with coal-chemical industry loads. Its No.2 330kV booster station operates 24 EBRGL-363/800 dry-type bushings supplied through Shandong Taikai Transformer.
Bushing Families Used in This Project
Similar Reference Projects
Thermal Power 550kV Bushings for the Zhongmei Yongcheng 2×1000MW Ultra-Supercritical Power Unit 550kV RIP Transformer Bushing (EBRGL-550/630) · 3 sets View project → Wind + Solar 363kV Bushings in Bulk for Huaneng Qingyang Wind-Solar Hybrid Demonstration (Lot A2) 363kV RIP Transformer Bushing (FBRGL-363/800) · 42 units View project → Energy Storage 252kV Bushings for the Huaneng Gongzhuling 235MW/470MWh Grid-Scale Storage Station 252kV RIP Transformer Bushing (FBRGL-252/630) · 3 sets View project →
Engineering Guides for Similar Projects
Similar project?
Have a project like this one?
Share your specifications and get a reference case matched to your requirements.